Roof / window installation industrial air cooler XK-23S/up

1.Product specification:


Model

XK-23S/up

Electric

Power

1.3KW

Voltage

220V~240V/50/60Hz

Speed

12

Fan system

Applicable area

80~120㎡(lower-latitude and moist areas),

100~150㎡ (higher-latitude and arid areas)

Max.Airflow 

23000m3/h

Fan type

Axial

Fan blades

Four Nylon blades

Pressure

200Pa

Noise

55~70db

Outer casing

Material

PP copolymerization EPC30R-H engineering plastic (100% new material).  

Discharge type

up

Dimension (mm)

1060*1060*960

Packed size ( assembled)mm

1070*1080*1130

Loading quantity 

(assembled)

20 units/20ft container,

44 units/40 ft container

Loading quantity (SKD) 

36~40 units/20ft container,

94~100 units/40 HQ container

Net weight

68KGS

Gross weight

78KGS

Control system

Wall controller

LCD control panel

Remote control

yes

Manual/Auto-drain

yes

Overload protect

yes

Water shortage protection

yes

Open phase protection

yes

Undervoltage protection

yes

Temp.&Humidity display

yes

Pre-cooling

Option

Memery Function

Option

Communication line

8m


 

 


2.Our advantage:

 

 


 



3.Delivery time:


5-7 working days for 20 feet container


7-10 working days for 40 HQ container

 



4.Loading and packing:


 



5.Warranty policy:


A.Whole machine are one year.


B.Body case:8 years.


C.Cooling pads:3 years.


D.Motor:2 years.


E.Fan blades:3 years.


F.Other parts are one year

 



6.Case:




7.FAQS:


A:Can you provide samples?

  of course, not free for samples but samples fees will be returned after a formal order.

 

B:How long is the delivery time for samples?

1-2 working days.

 

C:How long is the delivery time for bulk order?

Generally it takes us 7-10 working days to finish the order after receiving deposit.

 

D:What’s the payment term ?

30% deposit by T/T,70% balance before shippment by T/T or L/C at sight.

 

E:Can we use our own brand?

Yes, OEM and ODM service are accepted, and we could make your own brand on the products.

 

F:How often do I clean my evaporative cooling pads?

Pads should be cleaned at least once a season prior to storing for the winter. In hard water areas,cleaning may be required more frequently.Periodic ,visual examination is required.Remove the back or top of the cooler following the instructions in the operating manual.Look at the pads,if they show signs of heavy mineral deposits they will need to be cleaned.


                                                                                Contact us now


Tags: Roof / window air cooler